In spite of 3 consecutive days of 1.7 or above, The Dam Management team of Kathy Fejes, Cathy Meyer, John Ryan or their designee put the 4 inch log in the dam sometime the afternoon of the 6th. Raising the water another 1.2 inches in a day. Now 3.6 inches above WDNR target.